Joel OLLIVIER, Creator of GPMI |
|
Passioné by the Management of Production since
1977
Management, Direction of Projects
Directing Modeling, Design, Audits, Diagrams |
| |
Iron and steel industry, Defense, Nuclear power,
Para-Tanker, Electronics, Chemistry Heavy, Mechanical... |
| |
Higher and Special maths Louis College the
Large one - Paris
Mining engineer of Nancy (promotion 1974)
DEA of Mathematics Applied to the Management of
Production (1980) |
Industrial Experiment (Extracts) |
 |
COFLEXIP/TECHNIP
Design, followed realization and installation of
a Project of Management of the Plans industrialists Quality.
Retro Design of the design of the flexible devices and ends,
within the framework of the migration of scientific applications for
the research and the development. |
 |
ERAM
Installation of a cell OPC (Organization
Planning Controls) for the follow-up of projects of recasting of the
Information system (50 p). |
 |
DCN CHERBOURG
Control of work of a system of Management of
Manufacture of under sailors (France and Pakistan). Documentary
system, Estimate of Mass, Quality system, Stores and Stocks.
Bilingual application. |
 |
OST
Installation and direction of an external team
of corrective and evolutionary Maintenance of the Information system
(TMA). Management of the medium-term Plan. Help with the
reflexions of evolution of the industrial system (5 p). |
 |
CDF CHEMISTRY
Follow-up of the Realization and installation of
the GMAO (Maintenance of the equipment production Computer-assisted).
Analyze Management of Production. Animation of groups
users (120 speakers). Drafting of the schedule of conditions
CAM. Analyze management of the vapocraqueurs (manufacture of
ethylene). Installation of the follow-up of the hours of
production. |
 |
SOLLAC
Follow-up of the achievements in industrial data
processing: Automation of rolling mills (cold and hot trains),
Programming of models of rolling, Management of Production, Management
of the park of storage of rolled reels. |
 |
NATIONAL COMPANY OF IRON AND STEEL INDUSTRY (ALGIERS)
Definition, design and piloting of the
realization of the Management of the Physical Budget. |
 |
ALSATIAN COMPANY OF CONSTRUCTIONS MECANIQUES (SACM)
To that and analyzes of the whole of the
Management of Production (manufacture of diesel engines).
Proposal for solutions. Piloting of the data-processing
realization of restockings and the management of the storerooms. |
 |
GESMA
Data processing manager diagram concerning
research under marine of the future. Recognition of forms.
Mines. Fight anti-under navy. |
 |
EDF NUCLEAR THERMAL POWER STATIONS
Methodological expert for the systems design of
feedback of experiments following the interventions of maintenance in
power station. Development of the data models and treatments. |
 |
PAKISTAN NAVY
Piloting of the deployment of the Information
system of manufacture of under sailors in Pakistan. |
|
DRIRE, SME/SME
Audits within the framework of Programs LOGIC
for the DRIRE. |